The set itself is quick, often under an hour. It goes smoothly when everything below is ticked off before the truck leaves. Tell us your address and access first and we will tell you whether the shell comes off the truck or needs a crane day.

Paperwork and site

  • ☐ Approval in hand. Do not dig before it.
  • ☐ Engineering pack printed and on site.
  • ☐ Temporary fence up from the day digging starts. Your certifier checks it.
  • ☐ Hole dug and base laid, compacted and level to the drawings in your engineering pack.

Access

  • ☐ A clear run for the truck, 3 m wide and 5 m high.
  • ☐ Side access of 2.5 m for the excavator, 900 mm at a pinch.
  • ☐ Nothing overhead where the crane swings: powerlines, big branches.
  • ☐ Cars, bins and loose items off the driveway and street frontage.

Crane

  • ☐ If your site needs a separate crane, it is booked, confirmed and set up before the truck arrives.
  • ☐ The crane company has seen the reach, the weight and where it can set up.
  • ☐ Budget for a crane day, if you need one: typically about $1,000 to $2,500 in Sydney with the truck near the hole, or $4,000 to $10,000 over the house, with a road closure and traffic control extra. Not every job needs a crane: if the truck can reach the hole, or the shell can go down a side path on its edge, there may be no crane day at all.

Water, power and people

  • ☐ Water available on the day, enough to start filling as soon as the shell is set. Book a water truck if the tap will be slow.
  • ☐ Power available on the day.
  • ☐ Enough help on site, plus backfill material and the people to place it.
  • ☐ Someone home who can make quick decisions, phone on.

On the day

  1. The shell is lifted off the truck and set on the base at the approved location.
  2. It is checked for level along the coping in both directions and adjusted until it sits true.
  3. The plumber connects it as your engineering pack and the equipment need.
  4. Fill and backfill start together and keep going. A fibreglass shell is not safe and secure until it is full of water. See the backfill card.
Rain coming? Rain on an empty shell can shift it, and a hole that fills with water is a problem. Plan dig, set and fill as one continuous stretch, and only lock in delivery once your fill water is lined up.