Your trades, in order

Book them in this order, and ask each one these questions before you say yes. Plumbing and electrical must be licensed trades in all four states we deliver to. In the ACT a builder with a pool endorsement builds the pool.

1. Approval: certifier

  • Do you certify pools in my area?
  • Is my block a CDC or a DA? (NSW)
  • Beyond the engineering pack, what do you need from me, such as a site plan and fence plan?
  • Which inspections do you do, and when do I call you?

2. Excavation

  • Have you dug for a fibreglass shell before?
  • Does your machine run a laser level?
  • Will it fit my side access, 2.5 m or a smaller machine?
  • Is spoil removal included, and how do you price rock?

3. Crane

  • What tonnage and reach do you need from where you can set up?
  • Do you bring the lifting gear?
  • Do powerlines or the street need traffic management?
  • Can you be set up before the truck arrives?

4. Base

  • Which bedding material does my engineering pack call for?
  • How will you get it level to the drawings?
  • Will the base be ready, and checked, the day before delivery?

5. Set

  • Who is on site to guide the shell and check level both ways?
  • How many people do we need on the day?
  • Who adjusts the shell if it is not sitting true?

6. Plumbing: licensed plumber

  • Are you licensed in this state?
  • Have you plumbed a fibreglass pool and equipment pad before?
  • Can you connect on set day so the fill can start?
  • Where will the backwash go?

7. Electrical: licensed electrician

  • Are you licensed in this state?
  • Will you run the circuit to the equipment pad and connect the pump, chlorinator and light?
  • When do you need to see the bond-beam steel to do the earthing?
  • What paperwork will my certifier get?

8. Backfill

  • Which material does my engineering pack specify for my ground, and can you supply it?
  • Will you fill and backfill together, in stages?
  • Do I need a water truck, and who books it?
  • How do we keep rain and runoff out of the pool zone?

9. Bond beam and coping

  • Have you done coping on a fibreglass pool before?
  • Will you build the bond beam to the detail in my engineering pack?
  • When can the electrician earth the steel before the pour?
  • How long between the pour and the coping?

10. Fencing

  • Do you build to AS 1926.1?
  • Can you put up the temporary fence before the dig, as well as the permanent one?
  • Are the gates self-closing and self-latching?
  • What is the price per metre for the type I want?

11. Final certificate

  • What do you inspect before anyone swims?
  • Which barrier certificate do I get?
  • Who puts the pool on the register?

Before you book anyone

Send them your engineering pack. Anyone who will not work to it is the wrong trade for this job. The temporary fence goes up before the dig, even though the fencer finishes last.