Fibreglass pool kits for builders and landscapers
Builders and landscapers order the complete kit for a client's pool: shell, equipment package, engineering pack with the state certificate, and freight, in one delivered price. You get the drawings and certificate free before any deposit, so approval can run while you quote. There are 29 sizes from a 4.4 m plunge to an 11.6 m family pool, about 6 to 8 weeks from order to shell on site.
If your client bought their pool from us and you are putting it in, this page is for you too. What turns up, the paperwork that comes with it, how ordering works, every size we sell, and what the site needs before the truck arrives.

What arrives
- The shell. Australian-made, one piece, with the skimmer box, two returns and the hydrostatic valve fitted. Twelve gelcoat colours, all the same price, and a 25-year structural warranty.
- The equipment package. Pump, glass media filter, self-cleaning mineral chlorinator with automatic pH control, light and the handover kit, boxed. The client's package may include more, such as a heat pump or a robotic cleaner. See the gear.
- The engineering pack. Covered below.
- Freight. From the factory on the NSW Mid North Coast to the site, in the same delivered price.
The engineering pack
You get the engineered shell drawing, the standard installation details and the state compliance certificate. They come from the engineer and we send them as issued, never edited. Your certifier will want them before work starts, and they set out the dig, the bedding, the bond beam and the backfill.
The certificate for each state
Every kit comes with the compliance certificate the state asks for. We deliver fibreglass pool shells and kits across all four.
| State | Certificate in the pack |
|---|---|
| New South Wales | Certificate of Compliance |
| ACT | The NSW Certificate of Compliance, which the ACT accepts |
| Queensland | Form 15 |
| Victoria | Reg 126 |
Council or certifier approval, barrier compliance and the final inspection sit with the job, not with the pool supply. We answer the certifier's questions about the shell and the engineering. In NSW, the pool approval guide covers CDC or DA and the barrier.
How ordering works for a builder
- Quote by address and size. Tell us the model, the size and the site address. You get one delivered number for that address: the shell, the Essentials equipment package, the engineering pack, the compliance certificate and freight, including GST, held for 60 days. For a quick range first, the instant estimate works by size, package and postcode.
- Engineering pack for the certifier. We send the drawings and the certificate free, before any deposit, so your client's approval can run while you quote the rest of the job. We can extend the quote while the approval goes through.
- Deposit books the factory slot. A $5,000 deposit books the pool and the slot at the factory, and comes off the total. It is paid by card from the quote page or by bank transfer with the deposit invoice. It places your factory order, usually within a day or two, and once your shell is in production it is non-refundable, including if an approval does not come through, so if you are not sure the pool will be approved, get the approval first. If we cannot supply the pool, the deposit is refunded in full.
- Delivery date confirmed with the factory before it is promised. We tell you the factory's current number before the deposit and check in with the factory each week. The delivery date is confirmed before the balance is due, at least two weeks ahead, so nobody pays against a date that does not exist. If the factory or the weather moves it, we tell you straight away and agree a new one.
- Balance 14 days before delivery. The balance is due in full, in cleared funds, by bank transfer, 14 days before delivery. We do not dispatch a pool that is not paid for.
- Delivery day. You arrange clear access for the truck and the crane, and someone on site to accept the pool. If access on the day is not what was agreed, redelivery and crane costs are passed on at cost. Risk in the pool passes when it comes off the truck.
Model, size or colour can change at no charge until the factory starts the shell. The full wording is in our terms of supply, and the week-by-week version is on how it works.
What a kit costs
Every quote is worked out for the site address, because the price depends on the pool, size, equipment package and road distance. Doing a few pools a year? Ask about trade pricing below.
Every size at a glance
Nine shapes in 29 sizes. These are the factory's own figures. The drawing for the client's model is the one to build from.
| Model | Size | Depth | Water |
|---|---|---|---|
| Cleo 4 | 4.40 x 2.28 m | 1.30 m | 11,000 L |
| Cleo 5 | 5.90 x 2.28 m | 1.30 m | 13,000 L |
| Hamilton | 5.00 x 3.20 m | 1.50 m | 17,000 L |
| Nova 5 | 5.20 x 3.00 m | 1.50 m | 17,000 L |
| Nova SL-5 | 5.20 x 3.00 m | 1.40 to 1.62 m | 19,000 L |
| Nova 6 | 6.20 x 3.00 m | 1.50 m | 19,000 L |
| Nova SL-6 | 6.20 x 3.00 m | 1.34 to 1.62 m | 22,000 L |
| Nova SL-7 | 7.20 x 3.00 m | 1.35 to 1.68 m | 25,000 L |
| Cosmo 6 | 6.40 x 4.00 m | 1.18 to 1.73 m | 26,000 L |
| Cosmo 7 | 7.20 x 4.20 m | 1.13 to 1.72 m | 28,000 L |
| Cosmo 8 | 7.90 x 4.20 m | 1.07 to 1.76 m | 31,000 L |
| Cosmo 9 | 9.00 x 4.40 m | 1.05 to 1.82 m | 39,000 L |
| Cosmo 10 | 9.80 x 4.40 m | 1.00 to 1.86 m | 43,000 L |
| Cosmo 11 | 11.00 x 4.40 m | 1.10 to 1.84 m | 46,000 L |
| Oasis 6 | 6.20 x 3.40 m | 1.25 to 1.67 m | 22,500 L |
| Oasis 7 | 7.20 x 3.40 m | 1.29 to 1.63 m | 26,000 L |
| Majestic 7 | 7.20 x 2.50 m | 1.35 to 1.68 m | 20,000 L |
| Belmont 6 | 6.22 x 3.30 m | 1.26 to 1.65 m | 26,000 L |
| Belmont 7 | 7.58 x 3.35 m | 1.16 to 1.67 m | 28,000 L |
| Belmont 8 | 8.17 x 4.24 m | 1.16 to 1.73 m | 33,000 L |
| Belmont 9 | 9.25 x 4.29 m | 1.00 to 1.71 m | 39,000 L |
| Belmont 10 | 10.16 x 4.43 m | 1.00 to 1.80 m | 45,000 L |
| Belmont 11 | 11.56 x 4.75 m | 1.10 to 1.84 m | 53,000 L |
| Entertainer 6 | 6.20 x 3.50 m | 1.28 to 1.64 m | 24,000 L |
| Entertainer 7 | 7.20 x 3.50 m | 1.26 to 1.68 m | 28,500 L |
| Entertainer 8 | 8.20 x 3.50 m | 1.24 to 1.74 m | 32,500 L |
| Entertainer 8 Deluxe | 8.20 x 4.20 m | 1.24 to 1.74 m | 34,500 L |
| Resort 6 | 6.20 x 3.50 m | 1.28 to 1.64 m | 24,000 L |
| Resort 7 | 7.20 x 3.50 m | 1.26 to 1.68 m | 28,500 L |
Before delivery day
- The hole is dug to the drawings and the base is ready.
- The truck can get to the kerb: road width, parked cars, low branches.
- The crane is booked and has a set-up spot. Look up for powerlines and trees over the lift path.
- Your crane operator has the shell weight. Ask us and we will get it from the factory.
- Someone is on site to take delivery, and the bedding material is there.
Access is where jobs go wrong. The delivery and crane access guide covers it in detail. If you are unsure, send us photos of the street and the yard before booking anything.
On the day
The shell arrives on a trailer and the crane lifts it straight into the hole. Set it, check level in both directions, then fill with water and backfill together, in stages, so the pressure stays even on both sides of the wall. Never one without the other. The full sequence is on how it goes in.
Talk to us first if the hole will not be ready. A shell left lying on uneven ground can be damaged, and a shell can usually be held at the factory rather than delivered to a yard with no hole in it.
One person to ring
You deal with one person who knows the order, the drawings and the delivery. No call centre and no ticket number. Ring us on 0415 140 001 with anything that comes up.
Common questions
Can I get the engineering pack before my client pays a deposit?
Yes. Tell us the model and size and we send the engineered shell drawing, the standard installation details and the state compliance certificate free, before any deposit. The quote holds for 30 days and we can extend it while the approval goes through.
Which compliance certificate comes with the pool?
The one your state needs: the Certificate of Compliance in NSW, which the ACT also accepts, Form 15 in Queensland and Reg 126 in Victoria. It comes in the engineering pack with every kit.
How long from order to delivery?
About 6 to 8 weeks from order to shell on site, closer to seven heading into summer and around six off season. We tell you the factory's current number before the deposit, and we confirm the delivery date before the balance is due.
How heavy is the shell?
It depends on the model and size. Tell us which one and we get the weight from the factory so your crane operator can plan the lift properly. We would rather give you the real figure than a guess off a website.
Where does the backwash go?
To a sewer gully, not the stormwater. Your plumber will know the local rule, and your certifier will check it.
Do you do trade pricing?
Yes, for builders and landscapers doing a few pools a year. Shells nest, so two or three on the same truck share the freight. Ring us and we will set it up.
Doing a few pools a year?
Buy the shells and the gear from us, install with your own crew, and keep the install margin. Ask about trade pricing and shared freight.
Talk to us about tradeOr see a delivered price for your client's pool